- Project last updated by WoodWorks on 08-26-2024
Candlewood Suites on Ft. Drum
Fort Drum, NYThis 65,000 SF, four-story, 100 room hotel was similar to the Redstone hotel but was designed as a hybrid structural system that included CLT for the floors, roofs, shafts, and bearing wall systems. The nonbearing walls utilized panelized engineered wood stud construction. Although prefabricated bath pods were not utilized on this project, the hybrid componentized structural systems were fabricated off-site, shipped, and installed on-site concurrent with the CLT superstructure without compromising structural performance.
This was the second structure in the PAL portfolio designed to meet the highly restrictive military Anti-Terrorism and Force Protection (ATFP) requirements. The hotel was 20% larger than the baseline Privatized Army Lodging (PAL) hotel, the workforce was 44% smaller, used 34% fewer manhours to complete the structure, and remained 24% faster, contributing to an overall (without POD's and prefab mechanical ducting) project schedule savings of 10%.
Project Details
-
Number Of Stories
4
-
Bldg system
Mass Timber
-
Sq. Meters
6,038
-
Construction Type:
III-A
-
Building Type:
Hotel/Motel
-
Material Types:
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
Lendlease Design / Build Contractor + CLT Installer
-
Schaefer Structural Engineer
-
Charles Starck, RA, AIA Design Manager
-
Douglas Steimle Structural Engineer
-
Jeff Morrow Program Manager
-
Mathias Oberholzer Connection Design, DfMA
-
Luckett & Farley Architect of Record
-
Rest Easy, LLC Owner / Developer
-
Stantec Consulting Ltd. Civil Engineers
- Project last updated by WoodWorks on 08-26-2024