- Project last updated by WoodWorks on 08-15-2024
1 De Haro
San Francisco, CADesigned by Pfau Long Architecture, One de Haro is located at the intersection of San Francisco’s SOMA, Potrero Hill, and Showplace Square districts. Due to local zoning considerations, the 60-ft building includes offices on the upper stories and light industrial space on the ground floor and mezzanine. The upper floors are CLT, with the panels exposed to provide a beautiful, warm, natural wood finish. The ground floor is concrete, with 20-ft-tall ceilings and a welcoming mezzanine well suited to production, distribution, and repair-related businesses.
See the business case study for this project. The case study series aims to fill a gap in available information related to the financial performance of U.S. properties constructed with mass timber structural systems in buildings across various product sub-types. Using transparent quantitative data, each of the 10 case studies analyzes how mass timber has created value and provides a qualitative overview of successes, challenges, and lessons learned from the developer/owner perspective.
Project Details
-
Year Built
2021
-
Number Of Stories
4
-
Bldg system
Mass Timber
-
Sq. Meters
12,448
-
Construction Type:
IV-HT
-
Building Type:
Business (Office)
-
Material Types:
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
DCI Engineers Structural Engineer
-
RDH Building Science Building Enclosure Consultant
-
MAXXON® Supplier of acoustic underlayment
-
Sansin Timber Finishes
-
Colin Shane | P.Eng., P.E. Building Enclosure Consulting / Engineer
-
Dean Lewis Structural Engineer
-
Lance Plott Contractor
-
AGA Curtain Wall
-
Brian Flanigan Contractor
-
Evan Jacob Architect
-
Gino Gandolfo Contractor
-
Hathaway Dinwiddie General Contractor
-
Integral MEP Design
-
Ivy Liu Contractor
-
Jeff Brink Structural Engineer
-
John Fisher Developer
-
Jordan Hague Structural Engineer
-
Mansi Maheshwari Architect
-
Matt Covall Architect
-
Pan Pacific Plumbing
-
Perkins&Will Architect
-
Quinten Lee Structural Engineer
-
Robin Landis Structural Engineer
-
Romak Steel Supply
-
SKS Developer
-
Salem Lee Contractor
-
Simon Gallagher Mass Timber Sub.
-
Steve Shanks Developer
- Project last updated by WoodWorks on 08-15-2024