- Project last updated by WoodWorks on 12-11-2024
Britton Lumber Combined Heat and Power Project
Bath, NHBritton Lumber is installing a new biomass combined heat and power plant that required a building addition. We chose to go with Glulam beams/columns with a CLT roof system.
Project Details
-
Année de construction
2024
-
Number Of Stories
1
-
Système
Bois massif
-
Mètres carrés
211
-
Type de construction:
Unknown
-
Type de bâtiment:
Usine/Industriel
-
Types de matériaux:
Bois massif
Bois lamellé-croisé
Bois Lamellé-Collé
Hybride
Bois composite structurel
Bois de construction
Project Team
-
E.F. Wall & Assoc. Inc General Contractor
-
Ricky McLain Mass Timber Advisor
-
Wilson Engineering Services Owners Engineer