- Project uploaded by David Impson on 09-26-2024
- Project last updated by David Impson on 10-08-2024
The Marine Coordination Center
Norfolk, VAThe Marine Coordination Center (MCC/Administrative Building) is being established as a shoreside location to monitor and coordinate all offshore activity related to project construction and operations.
The MCC is an approximately 27,000 square foot 2-story building with parking below elevated building footprint. The second floor will feature office space, meeting rooms, controls room, maintenance shop, restrooms, locker rooms with showers, kitchen facilities, electrical equipment rooms and tool storage.
Project Details
-
Année de construction
2025
-
Number Of Stories
2
-
Système
Bois massif
-
Mètres carrés
4,879
-
Type de construction:
III-A
-
Type de bâtiment:
Usine/Industriel
-
Types de matériaux:
Bois massif
Bois lamellé-croisé
Bois Lamellé-Collé
Project Team
-
Britt, Peters and Associates Inc. Engineer
-
Timberlab Installer
-
David Impson Engineer
-
Rob Collings Structural Engineer
- Project uploaded by David Impson on 09-26-2024
- Project last updated by David Impson on 10-08-2024