- Project last updated by Michael Banta on 09-06-2024
Wellfield Botanic Gardens Pavilion
Elkhart, IN
The Wellfield Pavilion comprised approximately 6,000 sq. ft. with an estimated construction cost of $3.2 million. The Pavilion was designated for an assembly occupancy classification with a maximum planned occupancy warranting it being designed as a Risk Category III structure. Total project time was estimated at approximately two years to completion. Frost Engineering & Consulting was the engineer of record for this project and directed all major design decisions, including wind load generation for the open structure Pavilion. Frost directed and/or reviewed the design of all of the aforementioned structural material components in compliance with the Indiana Building Code and the relevant provisions of the IBC, ASCE 7, ACI 318, AISC 360, TMS 402/602, NCMA TEK, and NDS.
Project Details
-
Year Built
2024
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Square footage
6,000
-
Building Type:
Civic (Recreational)
-
Material Types:
Mass Timber
Glue-Laminated Timber (GLT or glulam)
Fasteners / Hardware
Project Team
-
Mid-Atlantic Timberframes Heavy Timber design, fabrication, installation
-
Michael Banta Contractor
-
Arkos Design Lead Architect
-
DJ Construction Contractor
-
Frost Engineering & Consulting Structural Engineer
-
Millies Engineering MEP Engineer
- Project last updated by Michael Banta on 09-06-2024