Mercer Mass Timber Addition

Spokane Valley, WA

This addition to the Mercer Mass Timber facility in Spokane Valley, WA features a hybrid steel frame with 3ply CLT walls and 5ply CLT roof.  Housing a planer to enhance the facility's wood processing capabilities, the building shell is a clear diagram of its enclosure requirements fitting around the equipment and their respective clearances.  

The enclosure system features 3ply CLT walls fastened from the interior to perimeter WF structural steel.  The walls additionally sit on a short concrete stem wall, on top of which is a continuous embed angle for base of wall attachment.  Steel columns were factory drilled to ease wood screw fastening through the flanges.  The wall panels are generally 10'-6" x 40'-0" with a double span over the structure at 20' on center.  The 5ply roof panels follow a similar dimensional logic.  The project team worked closely with the CLT manufacturer to dial in the common master panel dimensions to increase efficiency.

Version History
Project Details
  • Year Built

    2023

  • Number Of Stories

    1

  • Bldg system

    Mass Timber

  • Square footage

    10,000

  • Construction Type:

    V-B

  • Building Type:

    Factory/Industrial (warehouse, storage, parking, etc.)

  • Material Types:

    Mass Timber
    Cross-Laminated Timber (CLT)
    Hybrid (wood with steel or concrete)

Project Team
Version History
Need help with your own project?

WoodWorks can help find a team, technical details, and more.