- Project last updated by WoodWorks on 08-15-2024
Harder Mechanical Headquarters
Portland, ORIn North East Portland sits the new Harder Mechanical Headquarters constructed with Mass Timber. This 27,000-square-foot, three-level project features a structural steel frame with 25,,000-square-feet of Cross Laminated Timber (CLT) floors and roof diaphragm with a BRBF lateral system. The city is to complete its new earthquake-resistant police and emergency management building. Swinerton is providing timber engineering services on the project for the Mass Timber/CLT scope. The project is exciting to be a part of as it shows that mass timber is becoming more commonplace in commercial office space.
Project Details
-
Number Of Stories
2
-
Bldg system
Mass Timber
-
Square footage
27,000
-
Construction Type:
Unknown
-
Building Type:
Business (Office)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Hybrid (wood with steel or concrete)
Project Team
-
Simpson Strong-Tie Connectors and Screws
-
Swinerton Timber Furnish and Install
-
Timberlab Timber Engineer/Fabricator
-
Christopher Evans Operations Manager
-
William Silva Preconstruction
-
Zachary Brehm Project Manager
-
AAI Engineering Structural Engineer
-
Ankrom Moisan Architect
-
Harder Mechanical Owner
- Project last updated by WoodWorks on 08-15-2024