Herold Industrial Park

Greater Sudbury, ON


The industrial site lies at the intersection of the two largest highways in Northern Ontario. The new building is added to a site with an existing industrial building, increasing the density of the property for industrial tenants. The building is a mass timber structure to help lower its embodied carbon while maintaining a durable and attractive finished quality. 

Version History
Project Details
  • Year Built

    2023

  • Number Of Stories

    2

  • Bldg system

    Mass Timber

  • Square footage

    15,877

  • Construction Type:

    IV-HT

  • Building Type:

    Factory/Industrial (warehouse, storage, parking, etc.)

  • Material Types:

    Mass Timber
    Cross-Laminated Timber (CLT)
    Glue-Laminated Timber (GLT or glulam)

Project Team
  • Danielson Architecture Office Inc.
    Danielson Architecture Office Inc. Architect
  • Bloomington Developments Developer
  • CK Construction Concrete Contractor
  • SNC-Lavalin Mechanical / Electrical Engineers
  • Tall Pines Engineering Foundation Structural Engineer
  • Terraprobe Inc. Geotechnical Engineer
  • Timmerman Timberworks Wood Contractor
  • Tulloch Engineering Civil Engineer
  • Villano Construction Civil Contractor
Version History
Need help with your own project?

WoodWorks can help find a team, technical details, and more.