Centre for Addiction and Mental Health (CAMH) Temerty Research & Discovery Centre

Toronto, ON

The Centre for Addiction and Mental Health (CAMH) is Canada's largest mental health teaching hospital, one of the world's leading research centres in its field and serves over 38,000 patients annually.

With 385,000 sq. ft of space, the new Temerty Discovery Centre is a 7-storey building that will house1,400 staff, and will contain research and health labs, space for clinical trials, academic and lecture space, office spaces and a central atrium connecting everything together. The goal of the building is to be an inclusive and inviting hub, and to remove the stigma associated with mental health institutions.

The building uses exposed mass timber and is situated on a two-storey concrete podium; it will have a basement level that connects to other CAHM campus buildings. 

Mass Timber Creates an Inclusive and Inviting Space
The new Centre’s curvilinear mass timber building was created to be a welcoming oasis of compassion, dignity, and respect that exudes warmth and wellness. Its design prioritizes the human experience. 

The hybrid mass timber structure reduces the carbon footprint significantly compared to conventional building systems and helps to create a sense of warmth and well-being, reducing stress and increasing creativity.

Once completed, it will be Canada’s largest hybrid mass timber public facility.

Mass Timber Construction Details
For the project, cross-laminated timber (CLT) was integrated into the concrete composite floor systems. The full design team and external partners collaborated to conduct fire and acoustic testing on mockup assemblies and contributed to developing the design of the mass timber connections.

The concrete composite floor assembly features a unique bubble deck concrete - attached to the CLT through kerf cuts and shear keys. The project also incorporates a Raised Access floor system and meets stringent acoustic standards.

The Centre is targeting LEED V4 Platinum & Tier 3 Toronto Green City Standards. Ground was broken on the project in 2024.

Version History
Project Details
  • Année de construction

    2027

  • Number Of Stories

    7

  • Système

    Bois massif

  • Mètres carrés

    35,766

  • Type de bâtiment:

    Institutionnel

  • Types de matériaux:

    Bois massif
    Bois lamellé-croisé
    Hybride

Project Team
Version History
Vous avez besoin d'aide pour votre propre projet ?

WoodWorks peut aider à trouver une équipe, des détails techniques, etc.

2025 WW Networking Event IMTC