- Project last updated by WoodWorks on 08-15-2024
Candlewood Suites Hotels I & II, Fort Jackson
Columbia, SCFort Jackson, SC is the site of two mass timber Candlewood Suites Hotels. The East hotel is 86,762 SF, five stories, 146 rooms, and the West hotel is 95,745 SF, five stories, 172 rooms. The Fourth and Fifth, respectively, CLT structures designed to meet the highly restrictive military Anti-Terrorism and Force Protection (ATFP) requirements under the PAL program are expected to open in late 2020.
They were completed 37% faster than conventional light gauge metal (LGM) framing used on other hotels with the same scope and scale. As with JBLM, the structure is being completed with an 11-man crew, 7 of the crew were veterans and trained on-site. This is an over 40% reduction in crew size and man-hours when compared to the baseline Privatized Army Lodging (PAL) hotel. The use of off-site manufactured bath pods in conjunction with prefabricated mechanical ducting resulted in an overall project schedule savings of 20% to 25%.
Project Details
-
Year Built
2021
-
Number Of Stories
5
-
Bldg system
Mass Timber
-
Square footage
182,000
-
Construction Type:
III-B
-
Building Type:
Hotel/Motel
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
Lendlease Design / Build Contractor + CLT Installation
-
MAXXON® Gypcrete Floor Underlayment; Acoustimat Sound Deadening
-
Rothoblaas Safety
-
Charles Starck, RA, AIA Design Manager
-
Jeff Morrow Program Manager
-
Kargozian & Case Blast Resistance Design Engineers
-
LK Architecture Architect of Record + MEP Engineer
-
Morrissey Engineering Telecommunication Engineers
-
Rest Easy, LLC Owner / Developer
-
Robert Metoyer, AIA Project Architect
-
SCA Consulting Engineers Structural Engineers
- Project last updated by WoodWorks on 08-15-2024