- Project uploaded by Thomas Cox on 02-26-2021
Camps Boathouse
Albemarle, NCBoathouse on Lake Tillery NC. Frame of EWP and Cypress with 120MM CLT. The boathouse was fabricated and erected in less than 18 hours with a four-man crew.
Project Details
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Square footage
1200
-
Construction Type:
IV-A
-
Building Type:
Civic (Recreational)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Timber-Frame / Post and Beam
Heavy Timber Decking
Project Team
-
Green Apple-Woodworks Framing Framer Designer
-
Thomas Cox Contractor
- Project uploaded by Thomas Cox on 02-26-2021