OC Fair Administration Building Addition
Costa Mesa, CAThe OC Fair Administration Building Addition included a remodel to the existing wood framed building and Masonry, Steel and Mass Timber systems on the new addition.
Project Details
-
Year Built
2025
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Sq. Meters
3,134
-
Construction Type:
V-B
-
Building Type:
Government
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
I-joists
Lumber
Project Team
-
SmartLam NA CLT Panels
-
W.S. Klem Contractor Mass Timber and Rough Carpentry
-
Joe Dana Manufacturer / Fabricator
-
Barnhart-Reese Construction, Inc. General Contractor
-
LPA Design Studios Architect