Multnomah East County Library

Gresham, OR

The project, situated on a previously underutilized parking lot at NW Division Street and NW Eastman Parkway, is part of a county-wide $387M bond measure to update and modernize the local library system and leans into the region's forest products industries.  East County Library is the largest project to be developed from that initiative and is comprised of 1,200 glulam beams and nearly 300 CLT panels. Totaling 93,000 square feet, the library is a heavy timber system designed to reflect the "natural landscape and patterns of the Pacific Northwest. Holst Architecture says, "The new East County Library emulates the sense of wonder, refuge, and exploration that the Pacific Northwest’s forests evoke. Inspired by Native architecture, the design is connected to place using local, natural materials. Mass timber forms the structure of the building from columns to roofline, matched by a wood-filled interior of paneled walls, storefronts, and balustrades.

Version History
  • Project uploaded by James Alexander on 12-06-2024
  • Project last updated by James Alexander on 12-06-2024
Project Details
  • Année de construction

    2024

  • Number Of Stories

    2

  • Système

    Bois massif

  • Mètres carrés

    8,639

  • Type de construction:

    IV-HT

  • Type de bâtiment:

    Civique (Loisir)

  • Types de matériaux:

    Bois massif
    Bois lamellé-croisé
    Bois Lamellé-Collé

Project Team
Version History
  • Project uploaded by James Alexander on 12-06-2024
  • Project last updated by James Alexander on 12-06-2024
Vous avez besoin d'aide pour votre propre projet ?

WoodWorks peut aider à trouver une équipe, des détails techniques, etc.