- Project uploaded by WoodWorks Innovation Network on 10-15-2021
- Project last updated by Krystal – Communications on 04-16-2024
Timber House
New Westminster, BCTimber House is a 77-unit mid-rise multi-family housing development that is located along the Fraser River. Cross-laminated timber panels are used as floors, bearing walls, and shearwalls on this project. In addition to being the primary structure, CLT is being used as an integral design feature with each unit having one exposed ceiling and one exposed wall showcasing the natural and attractive aesthetic of the wood. As a true kit-of-parts solution, Timber House optimizes mass timber’s structural and aesthetic design qualities with constructability and cost efficiency.
Project Details
-
Year Built
2023
-
Number Of Stories
6
-
Bldg system
Mass Timber
-
Square footage
112,000
-
Construction Type:
Unknown
-
Building Type:
Multi-Family (Apartments, Condos, etc.)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
Fast + Epp Structural Engineer
-
Kalesnikoff Timber Supplier
-
Seagate Mass Timber Inc. Mass Timber Installation
-
Robert Jackson Engineer of Record
-
Aragon Construction General Contractor
-
RWA Group Architecture Architect
- Project uploaded by WoodWorks Innovation Network on 10-15-2021
- Project last updated by Krystal – Communications on 04-16-2024