- Project last updated by WoodWorks on 08-15-2024
Kresge College Renewal at UC Santa Cruz
Santa Cruz, CAThis renewal project was designed to preserve the unique architectural and cultural spirit of the original Kresge College while updating it to the needs of 21st century students, with a much-needed increase in housing, classroom, and student support space. The first phase of the project includes three new residential buildings and an academic building, made with a combination of CLT floor and roof diaphragms, glulam beams, wood shear walls, and light wood-frame walls.
Project Details
-
Year Built
2023
-
Number Of Stories
4
-
Bldg system
Mass Timber
-
Square footage
69,517
-
Construction Type:
I-A
-
Building Type:
Student Housing
-
Material Types:
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
Holmes Mass Timber Engineer
-
Simpson Strong-Tie Connectors and Screws
-
Swinerton Timber Furnish and Install
-
Timberlab Timber Furnish and Install
-
Bevan Jones Fire Engineer
-
Dean Lewis Project Manager
-
Eric McDonnell Design-Build Mass Timber Engineer
-
Zachary Brehm Sr. Project Manager
-
Zander Sivyer Design-Build Mass Timber Engineer
-
Ashley Hinton Architect
-
Erica Spiritos Preconstruction Manager
-
Kristy Davis General Contractor
-
Magnussen Klemencic Associates Structural Engineer
-
Studio Gang with TEF Design Architect
-
Trubeck General Contractor
-
UC Santa Cruz Owner
- Project last updated by WoodWorks on 08-15-2024