Herold Industrial Park
Greater Sudbury, ON
The industrial site lies at the intersection of the two largest highways in Northern Ontario. The new building is added to a site with an existing industrial building, increasing the density of the property for industrial tenants. The building is a mass timber structure to help lower its embodied carbon while maintaining a durable and attractive finished quality.
Project Details
-
Year Built
2023
-
Number Of Stories
2
-
Bldg system
Mass Timber
-
Square footage
15,877
-
Construction Type:
IV-HT
-
Building Type:
Factory/Industrial (warehouse, storage, parking, etc.)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
Danielson Architecture Office Inc. Architect
-
Bloomington Developments Developer
-
CK Construction Concrete Contractor
-
SNC-Lavalin Mechanical / Electrical Engineers
-
Tall Pines Engineering Foundation Structural Engineer
-
Terraprobe Inc. Geotechnical Engineer
-
Timmerman Timberworks Wood Contractor
-
Tulloch Engineering Civil Engineer
-
Villano Construction Civil Contractor