- Project uploaded by Ethan Biederman on 03-25-2021
- Project last updated by WoodWorks on 08-15-2024
C. Gerald Lucey Building
Brockton, MAThis 33,000 GSF urban infill building will be comprised of modern, flexible workspaces for the contact center, hearings rooms (where the DUA interfaces with the public by hearing disputed cases with legal representation present), and administrative staff. This project is designed with a cross laminated timber (CLT) and glulam beam and column structural system. Given DUA’s staff fluctuates based on the State’s unemployment rate, flexible workspaces are of the highest priority.
The ground floor will also be home to a downtown outpost for Massasoit Community College (MCC). Pairing DUA with an academic partner who can provide workforce training is a unique opportunity for the Commonwealth, MCC, and the City of Brockton.
Project Details
-
Year Built
2022
-
Number Of Stories
3
-
Bldg system
Mass Timber
-
Square footage
33000
-
Construction Type:
III-B
-
Building Type:
Government
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Hybrid (wood with steel or concrete)
Project Team
-
South County Post & Beam Mass Timber Design Assist, Fabrication, Installation
-
Ethan Biederman Mass Timber Coordination
-
Bond Building Construction, Inc. Construction Manager
-
Dario Santiago Project Manager
-
Jones Architecture Architect
-
Marc Perras Architect
- Project uploaded by Ethan Biederman on 03-25-2021
- Project last updated by WoodWorks on 08-15-2024