- Project uploaded by David Impson on 08-01-2022
- Project last updated by WoodWorks on 02-07-2024
William A. Floyd Amphitheater
Anderson, SCNew mass timber bandshell for the William A. Floyd Amphitheater in Anderson, SC.
Project Details
-
Year Built
2022
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Square footage
N/A
-
Construction Type:
V-B
-
Building Type:
Civic (Recreational)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Timber-Frame / Post and Beam
Hybrid (wood with steel or concrete)
Project Team
-
Britt, Peters and Associates Inc. Engineer
-
Rothoblaas Dowels and hangers
-
David Impson Structural Engineer
-
Goodwyn Mills Cawood Architect
- Project uploaded by David Impson on 08-01-2022
- Project last updated by WoodWorks on 02-07-2024