- Project uploaded by Tanya Luthi on 11-06-2020
Mountain Equipment Co-op Head Office
Vancouver, BCWith a mass timber structure, sophisticated lighting and ventilation systems, and a building envelope that maximizes daylight, the design team helped create a beautiful workspace that is 70% more efficient than the typical office building. The exposed mass timber (nail-laminated timber floor and roof panels, exposed on the soffit; glulam columns and beams) creates a warm aesthetic to the workspace.
Located in the False Creek Flats area of Vancouver, this four-storey building includes open offices along the main perimeter, which allow for plentiful natural light. The building also includes an interconnected atrium with a feature stair, enclosed meeting rooms, a large multipurpose space, a bouldering wall, and a roof garden.
At the time of completion, the MEC head office was one of the largest contemporary mass timber buildings in Canada.
Project Details
-
Year Built
2014
-
Number Of Stories
4
-
Bldg system
Mass Timber
-
Square footage
10,000 m² (110,000 ft²)
-
Construction Type:
Unknown
-
Building Type:
Business (Office)
-
Material Types:
Mass Timber
Nail-Laminated Timber (NLT)
Project Team
-
Fast + Epp Structural Engineer
-
Seagate Mass Timber Inc. Installer
-
Global Integrated Flooring Solutions (Global IFS) Underfloor Air System, Modular Power & Raised Access Floor
-
SmartLam NA Timber Supplier
-
Proscenium Architecture + Interiors Architect
-
Ventana Construction General Contractor
- Project uploaded by Tanya Luthi on 11-06-2020