Scarborough Civic Centre Library

Toronto, ON

The Scarborough Civic Centre Library features glu-lam wood frame construction and a complex building form with three layers of framing – primary, secondary and tertiary – all stacked to allow double cantilevers and maximize the number of bearing type connections. Cut ends are deliberately left overhanging to further randomize the irregular geometry.offset with clerestory windows to allow light penetration to the interior of the building.

Version History
  • Project uploaded by WoodWorks on 04-05-2022
Project Details
  • Year Built

    2015

  • Number Of Stories

    1

  • Bldg system

    Mass Timber

  • Sq. Meters

    1,347

  • Construction Type:

    I-A

  • Building Type:

    Business (Office)

  • Material Types:

    Mass Timber

Project Team
Version History
  • Project uploaded by WoodWorks on 04-05-2022
Need help with your own project?

WoodWorks can help find a team, technical details, and more.