Britton Lumber Combined Heat and Power Project
Bath, NHBritton Lumber is installing a new biomass combined heat and power plant that required a building addition. We chose to go with Glulam beams/columns with a CLT roof system.
Project Details
-
Year Built
2024
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Sq. Meters
211
-
Construction Type:
Unknown
-
Building Type:
Factory/Industrial (warehouse, storage, parking, etc.)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Hybrid (wood with steel or concrete)
Structural Composite Lumber (e.g. LVL and LSL)
Lumber
Project Team
-
E.F. Wall & Assoc. Inc General Contractor
-
Ricky McLain Mass Timber Advisor
-
Wilson Engineering Services Owners Engineer