Gateway Gymnasium
Lake Villa, ILThis project is an addition to the existing gymnasium building and features an exposed CLT deck, showcasing the beauty and strength of wood, along with a unique architectural round shape and a green roof that enhances sustainability and integrates seamlessly with the surrounding environment.
Project Details
-
Année de construction
2025
-
Number Of Stories
1
-
Système
Bois massif
-
Mètres carrés
231
-
Type de construction:
II-B
-
Type de bâtiment:
Civique (Loisir)
-
Types de matériaux:
Bois massif
Bois lamellé-croisé
Project Team
-
Denk & Roche Builders Installer
-
Sterling Structural CLT
-
Thornton Tomasetti Engineer
-
Executive Construction Inc. General Contractor
-
MKB Architects Architect