- Project uploaded by Joe Points on 03-04-2024
- Project last updated by Jon Potter on 06-10-2024
Dodge Community Church
Estacada, ORIn the wake of the 2020 Riverside fire — which burned 138,000 acres in Clackamas County Oregon — the Dodge Community Church was burned to the ground. The church was rebuild using CLT panels and glulam columns and beams.
Project Details
-
Année de construction
2023
-
Number Of Stories
1
-
Système
Bois massif
-
Mètres carrés
232
-
Type de construction:
V-B
-
Type de bâtiment:
Assemblée (Culte, Restaurant, Théâtre)
-
Types de matériaux:
Bois massif
Bois lamellé-croisé
Bois Lamellé-Collé
Project Team
-
Carpentry Plus, Inc Installer
-
Stonewood Structural Engineers Engineer
-
ZGF Architects Architect
- Project uploaded by Joe Points on 03-04-2024
- Project last updated by Jon Potter on 06-10-2024