- Project uploaded by Steven Lipinski on 03-25-2021
- Project last updated by Nathan Mackey on 02-07-2025
C. Gerald Lucey Building
Brockton, MALa ville de Brockton est un lieu de rencontre et d'échange.
Project Details
-
Année de construction
2022
-
Number Of Stories
3
-
Système
Bois massif
-
Mètres carrés
3,065
-
Type de construction:
III-B
-
Type de bâtiment:
Gouvernement
-
Types de matériaux:
Bois massif
Bois lamellé-croisé
Bois Lamellé-Collé
Hybride
Project Team
-
South County Post & Beam Mass Timber Design Assist, Fabrication, Installation
-
Steven Lipinski Mass Timber Coordination
-
Bond Building Construction, Inc. Construction Manager
-
Dario Santiago Project Manager
-
Jones Architecture Architect
-
Marc Perras Architect
- Project uploaded by Steven Lipinski on 03-25-2021
- Project last updated by Nathan Mackey on 02-07-2025