Chewelah High School Stadium Press Box

Chewelah, WA

The aging high school stadium press box serving students in Chewelah, Washington sorely needed replacement.  A tight design schedule - as well as impending fall football schedule - lead our team to consider alternative building delivery methods.  Working closely with the mass timber supplier Mercer, this project includes flat-packed 3-ply CLT panels as well as innovative CLT studs which utilize master panel off-cuts to frame the window wall.

The client required the elevated vertical structure to be galvanized steel for longevity.  The CLT panels were CNC'd to nest onto the steel structure as well as nest to each other for ease of installation.  A total of 5 picks completed the CLT panel lifts - in addition to the small interior partial demising walls (which also provided support to the roof) and CLT studs / headers / sills at the wall to receive press windows.

All CLT is to remain exposed to the interior.

Version History
Project Details
  • Année de construction

    2024

  • Number Of Stories

    1

  • Système

    Bois massif

  • Mètres carrés

    18

  • Type de construction:

    V-B

  • Type de bâtiment:

    Éducatif

  • Types de matériaux:

    Bois massif
    Bois lamellé-croisé
    Hybride

Version History
Vous avez besoin d'aide pour votre propre projet ?

WoodWorks peut aider à trouver une équipe, des détails techniques, etc.