- Project uploaded by Cody Wortmann on 11-13-2023
- Project last updated by Stephanie Gattas on 01-24-2025
Builders District
Omaha, NE
The Mass Timber building marks a significant milestone as Omaha’s first hybrid timber structure, showcasing innovative sustainable design. This impressive five-story facility will blend office and retail spaces, making it an attractive hub for businesses and shoppers alike. Strategically situated in the vibrant Builder’s District, the building is poised to enhance the community by embracing its amenity-rich surroundings.
The design incorporates 50% mass timber, highlighting a commitment to eco-friendly construction practices and offering a warm, inviting ambiance. The Builder’s District itself is a thoughtfully developed area dedicated to fostering a sense of community, with a variety of spaces designed for reconnection, relaxation, and daily routines. Residents and visitors can look forward to enjoying this dynamic environment that promotes interaction and well-being.
“We are excited to be a part of this project because it’s offered a unique and challenging design of integrating the beauty of mass timber with the tradition of a structural steel design,” said Ben Duckworth, Timberlyne’s Project Manager for the Builder’s District.
Our partnership with Noddle was meaningful and allowed us to work towards the goal of incorporating Mass Timber into their vision. “Working with Timberlyne was seamless; our partnership began early in the design process, and they helped us navigate the intricacies of an unfamiliar product. Our design and construction team collaborated with Timberlyne’s team on every element to find the most efficient sizing, details, and installation methods. We are thrilled with the finished product and will continue to consider mass-timber on our projects moving forward.” – Zac Gemar, Noddle Companies
Project Details
-
Year Built
2024
-
Number Of Stories
5
-
Bldg system
Mass Timber
-
Square footage
151,000
-
Building Type:
Business (Office)
-
Material Types:
Mass Timber
Hybrid (wood with steel or concrete)
Project Team
-
Timberlyne Group Installer
-
HDR Architecture
-
Kiewit Building Group GC
-
Noddle Developer
- Project uploaded by Cody Wortmann on 11-13-2023
- Project last updated by Stephanie Gattas on 01-24-2025