- Project uploaded by Taylor LeBlanc on 03-20-2024
- Project last updated by Bruce Harris on 07-25-2024
Winchester Regional Airport Terminal
Winchester, VAWinchester Regional Airport Terminal is a relocation and expansion of an existing 9,245-square-foot terminal. The total construction cost will be $6.3 Million. The project will include 70 new parking spaces, and will comply with new FAA standards that include 400 feet between the terminal and the runway. The new building includes 7,810 SF of CLT.
Project Details
-
Year Built
2027
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Sq. Meters
1,518
-
Construction Type:
III-B
-
Building Type:
Transportation (Airports, Train or Subway Stations)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
- Project uploaded by Taylor LeBlanc on 03-20-2024
- Project last updated by Bruce Harris on 07-25-2024