- Project last updated by Deirdre King on 12-12-2024
Walmart Home Office
Bentonville, ARWalmart’s new home office is being built on a 350-acre campus of native seeded greenery. Scheduled to open in phases between 2020 and 2024, it will consist of more than 2.5 million sf of mass timber construction spread over 11 buildings. In addition to offices, buildings will include a fitness center, dining areas, daycare facility, auditorium, and visitor center. The open floor plans in working spaces will feature exposed wood to provide warmth and nature that will be enjoyed inside and out. The new buildings will feature ample natural light, and the campus will be connected by paths and bike trails, surrounded by greenery and wetlands.
Project Details
-
Year Built
2024
-
Number Of Stories
4
-
Bldg system
Mass Timber
-
Sq. Meters
278,700
-
Construction Type:
III-B
-
Building Type:
Business (Office)
-
Material Types:
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
Fast + Epp Strutural Engineering Lead
-
Foust Fab & Erectors Installer
-
Mercer Mass Timber Mass timber (previously Structurlam)
-
Rothoblaas Connectors, Screws and Tools
-
Rothoblaas Waterproofing products / envelope
-
Simpson Strong-Tie Connectors and Screws
-
Ian Boyle Project Director / Engineer of Record
-
Jeff Morrow Mass Timber Preconstruction Consultant for CM
-
Momo Sun, PE, PEng, LEED Green Associate Project Manager
-
Zachary Brehm Project Executive, Timberlab
-
Derek Ratzlaff Project Manager
-
Eloise Allsop Project Manager
-
Gensler Architect
-
Maryse Campeau Project Manager
-
MBL Architect
-
Paul Fast Principal-in-Charge
-
Sarah FitzMaurice Project Manager
- Project last updated by Deirdre King on 12-12-2024