- Project uploaded by Meghan Doring on 12-05-2023
- Project last updated by Susan Jones on 06-10-2024
Dixie Fire Replacement Modular Mass Timber Homes
Greenville, CAThree modular, mass timber homes using passive house principles to start replacing the 660 homes in Greenville, California that were destroyed in August 2021 when the Dixie Fire swept through the region. Just two years after the event, three homes were completed for their owners. All three were permitted under Master Permits in Plumas County, CA for ease of future building. The small, fire-resistant homes are designed under the California Wildland Urban Interface (WUI) codes to be fire-resistant. Modularly planned with prefabricated mass timber by DR Johnson just 300 miles away in Riddle, OR, the homes are designed to be built out of local wood once local sawmills and potentially mass timber fabrication plants get up and running on a local saw mill site in Crescent Mills, CA. Modular wet cores were constructed in Washington State. The homes are designed in three different sizes, with standard floorplates at 600 SF, 800 SF and 1,000 SF, with a number of add-on combinations and ADU options for future expansion and growth.
Project Details
-
Year Built
2023
-
Number Of Stories
2
-
Bldg system
Mass Timber
-
Sq. Meters
222
-
Construction Type:
V-B
-
Building Type:
Multi-Family (Apartments, Condos, etc.)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Light-Frame
I-joists
Coatings
Fasteners / Hardware
Project Team
-
atelierjones LLC Architectural Design
-
Meghan Doring Architect
-
Susan Jones Design Principal
-
Harriott Valentine Engineers Structural Engineer
-
LightsCreek Construction Contractor
-
Method Homes Modular Wet Core Manufacturer
-
Sugarpine Engineering MEP Engineer
-
The Sierra Institute for Community and Environment Developer/ Builder
- Project uploaded by Meghan Doring on 12-05-2023
- Project last updated by Susan Jones on 06-10-2024