- Project uploaded by Matt Byrum on 03-25-2020
- Project last updated by WoodWorks Innovation Network (WIN) on 08-07-2024
Hutton Corporation Headquarters (HHQ)
Wichita, KSThe new Hutton Corporation headquarters was conceptualized with three goals in mind: To showcase our design and construction capabilities; to attract and retain the workforce of the future; and to signal to Midwestern communities that Wichita is a place to find world-class architecture and design.
The two-story mass timber structure is made from glulam columns and beams, and CLT decking for the floors and roof. In addition to mass timber, the building also utilizes many concrete and steel elements, including a 34-foot cast-in-place concrete wall and custom fabricated steel staircase.
The Wichita headquarters building was designed to accommodate 74 employees; it currently houses 50 and was built with room to grow. Hutton has 300 team members across four offices.
Project Details
-
Number Of Stories
2
-
Bldg system
Mass Timber
-
Sq. Meters
2,415
-
Construction Type:
V-B
-
Building Type:
Business (Office)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
Mercer Mass Timber Mass timber (previously Structurlam)
-
Baughman Company Civil Engineer
-
Bryce Harris Electrical Lead
-
Chris Wapelhorst Mechanical Engineer
-
Cristy Helmick Structural Engineer
-
David Moses, PhD, PEng, PE, LEED®AP Specialty Structural Engineer
-
Hunter White Build Project Manager
-
Hutton Design Architect & General Contractor
-
Matt Byrum Architectural Team Leader
-
Matt Newman Plumbing Lead
-
Moses Structural Engineers Inc. Specialty Engineer
-
PEC Structural, Mechanical & Electrical Engineer
-
Trevor Wooten Civil Engineer
-
Zach Bowden Structural Engineer
- Project uploaded by Matt Byrum on 03-25-2020
- Project last updated by WoodWorks Innovation Network (WIN) on 08-07-2024