Delta Dental
Colville, WAThe CLT roof deck of the Delta Dental Call Center in Colville, WA was completely installed in 4 days. The contractor thought the 22,000 sq foot roof system would be in place in 5 days. Fabrication of the beams and CLT for immediate fit on to the job site is critical for speed, safety, and accuracy.
Project Details
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Sq. Meters
1,858
-
Construction Type:
V-A
-
Building Type:
Business (Office)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Light-Frame
Project Team
-
DCI Engineers Structural Engineer
-
Foust Fab & Erectors Installer
-
Sansin Timber Finishes
-
Simpson Strong-Tie Fasteners and Connectors
-
Vaagen Timbers Timber Supplier
-
Bouten Construction Co. Contractor
-
HDG Architecture Architect