- Project uploaded by WoodWorks on 01-06-2022
- Project last updated by Krystal – Communications on 06-10-2024
Arena Stage Theater Facade
Washington, DCIn the sea of concrete and granite that people have come to expect from buildings in Washington, D.C., a new structure showcasing wood stands out.
When Arena Stage at the Mead Center for American Theater reopened in 2010, it was the first modern structure to use heavy timber components in the United States' capital. It was also the first project in the U.S. to use an efficient hybrid wood and glass enclosure to envelop two existing structures.
Although the timber-backed glass façade supporting a steel roof was a complex design, the decision to use wood was an easy one. “Like most arts projects, especially non-profits like Arena Stage, budget was very tight," said Michael Heeney, principal and executive director for Bing Thom Architects of Vancouver, BC. “We didn't have money for finishes, so the structure had to be beautiful, and wood made perfect sense. Yet in the end, wood ended up doing triple duty. We used it to hold up the roof; we also used it to hold up the glass. And, it provided the final finish for the space. Wood was very cost effective in all three respects."
This custom timber structure supports a 650 foot long curved cable-suspended glazed façade. Each of the 18 massive elliptically-turned Parallam columns are tipped with a custom shaped 350 lb casting and tilted at 4 degrees from vertical. The 50- 60 foot high columns not only support the suspended array of Parallam glazing members, but also a 500 foot long steel roof structure with 90 foot cantilever.
Download the WoodWorks Technical Case Study on this project.
Project Details
-
Year Built
2008
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Sq. Meters
18,580
-
Construction Type:
Unknown
-
Building Type:
Assembly (Worship, Restaurant, Theater, etc.)
-
Material Types:
Mass Timber
Hybrid (wood with steel or concrete)
Structural Composite Lumber (e.g. LVL and LSL)
Project Team
-
Fast + Epp Structural Engineer
-
StructureCraft Design-Build Subcontractor
-
Ian Boyle Structural Engineer
-
Lucas Epp Structural Engineer
-
George Conard, VP General Contractor
-
Michael Heeney Bing Thom Architects
-
Revery (formerly Bing Thom Architects) Architect
-
Shinobu Homma Architect