- Project uploaded by Taylor LeBlanc on 09-14-2022
- Project last updated by WoodWorks on 07-12-2023
The Joinery–420 E. 22nd St.
Charlotte, NCTimberlab provided mass timber installation services on the unique 5 over 2 hybrid timber structure. Located in Charlotte's Mill District, Spacecraft McFly, the building is a block away from Parkwood Station on Charlotte’s Lynx Blue Line light rail, providing a low-carbon, transit-oriented development. Project partner, Kalesnikoff supplied over 700 individual CLT panels spanning up to 60′ lengths to make up the top four floors.
Project Details
-
Year Built
2023
-
Number Of Stories
7
-
Bldg system
Mass Timber
-
Sq. Meters
9,011
-
Construction Type:
III-A
-
Building Type:
Multi-Family (Apartments, Condos, etc.)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Timber-Frame / Post and Beam
Hybrid (wood with steel or concrete)
Light-Frame
Project Team
-
Britt, Peters and Associates Inc. Structural Engineering
-
Kalesnikoff Timber Supplier
-
Swinerton General Contractor
-
Timberlab cross-laminated beams and a prefabricated structural system
-
David Impson Structural Engineer
-
Graham Montgomery Technical Director
-
Brian Turner Structural Engineer
-
Shook Kelley Architect
- Project uploaded by Taylor LeBlanc on 09-14-2022
- Project last updated by WoodWorks on 07-12-2023